Braddock Lift Station Upgrades

Braddock Sewage Lift Station Upgrades (Culver City) The Braddock Lift Station was completed in July 2011 at a cost of $2.2 million. The facility improvements include a new wet well, valve and meter vaults, valves, meter, 3 submersible pumps 45 Hp,     200 kw generator, MCC and control system. Project was upgraded on the existing site that required a temporary pumping system for 9 months, shoring system and an extensive groundwater dewatering system.  PRP Engineering provided project design as well as construction management services.